← All Case Studies

Platform Research

Three shops. Three bottlenecks. One platform.

Custom manufacturers in precision machining, custom fabrication, and structural steel — each with a different constraint. Here's what changed across all three.

The pattern

Each shop was running on spreadsheets, text threads, and memory. One was losing bids because quotes took four days. Another had a scheduler reshuffling the board eleven times a week with no early warning when something slipped. The third couldn't tell if a job was profitable until after it shipped — sometimes months later.

Different constraints, same root cause: no connected system. Quoting lived in one spreadsheet, scheduling in another, job costs in a third — and none of them talked to each other. Every handoff was a phone call or a guess.

When you replace all three with a single platform, the bottleneck stops shifting. The thing that was hiding in the gap between spreadsheets stops hiding.

What the platform covers

📋

Quotes

Same-day quoting with margin guardrails baked in. The estimator builds each quote with actual labor hours and material costs — not gut feelings — and the system flags when a margin is running thin before it goes out the door.

🏭

Active Projects

Connected schedule and floor-wide capacity visibility. Every job has a live status card — who's working it, where it stands, when it's due. When something slips, the board shows it before anyone has to ask.

💰

Job Costing

Margin visibility before the next quote goes out. Actual labor hours, material costs, and overhead tracked against the job — so by the time a similar job comes in, the estimator has real data to price it with.

Results across the cohort

Shop Constraint Before After
Great Lakes Fabrication Quoting speed 22% win rate 38% win rate
Tri-State Steel Fabrication Schedule visibility 71% on-time 94% on-time
Midwest Precision Machining Job costing 18% rework 6% rework

Read each shop's story

📋

Great Lakes Fabrication

Bid win rate went from 22% to 38% after cutting quote turnaround from 4 days to same day.

🏭

Tri-State Steel Fabrication

On-time delivery went from 71% to 94% after replacing daily board reshuffles with real-time capacity visibility.

💰

Midwest Precision Machining

Rework rate dropped from 18% to 6% after connecting job costing to the quoting loop.

See if your shop fits this picture →

Results are from real shops. Names and identifying details are fictionalized for privacy.